Menekse WPP

Menekse Yenilenebilir Enerji and Elektrik Uretim AS

Licensed Menekşe Wind Power Plant is located within Menekşe Renewable Energy and Electricity Generation Co. Menekşe WPP, established in Yozgat, Sorgun-Çekerek region, started to generate electricity in January 2025. It is planned to generate 80.000 MWh per year with a production capacity of 24 MWm on 177 acres of land. The targeted annual carbon emission amount of Menekşe WPP is 51.850 tonnes.

Production

Annual Production Chart

Monthly Production Chart

Technical Data

LOCATION

LOCATION

Yozgat – Sorgun - Çekerek and Araplı Villages

LICENSE DURATION

LICENSE DURATION

49 years starting from May 2023

LAND SIZE

LAND SIZE

177 decares

PRODUCTION AMOUNT - MWh / YEAR

PRODUCTION AMOUNT - MWh / YEAR

80,000,000 kWh/year

MWe (AC) / MWm (DC) POWER

MWe (AC) / MWm (DC) POWER

20 MWe / 24 MWm

ENERGIZED HOUSING

ENERGIZED HOUSING

26.600 pieces

Numeric Data

CONSULTANCY

CONSULTANCY

Renewatt

TURBINE BRAND AND TYPE

TURBINE BRAND AND TYPE

Goldwind GW 165

TOWER SIZE

TOWER SIZE

100 m

WING DIAMETER

WING DIAMETER

165 m

CARBON EMISSIONS

CARBON EMISSIONS

51.850 tons/year